The greenhouse warming starter is designed to help manage temperature rise in greenhouses effectively. Here are 8 key points to consider when using the warming starter:
1. For a greenhouse measuring 60m x 7m, approximately 4kg of the warming starter is recommended. This includes 3kg of wheat bran or rice bran, which serves as a base for the fermentation process.
2. The amount of starter required should be mixed evenly with 10kg of rice bran or wheat bran. Add about 8kg of water and mix thoroughly. To check if the moisture level is correct: the mixture should hold together when squeezed in your hand, with no dripping. If it's too wet, add more bran; if too dry, mist with water until the right consistency is achieved. Once properly mixed, the inoculant should be stacked and left undisturbed for 12-24 hours at a temperature between 20-25°C.
3. You can spray 2% urea or brown sugar water onto the straw to enhance microbial activity. Alternatively, soak the straw for 12-24 hours before placing it into the greenhouse to create a more effective compost pile.
4. Layer the straw, manure, and fermentation starter alternately, ensuring even distribution for consistent heat generation.
5. Adjust the thickness of the straw layer depending on the type of crop and the desired temperature inside the greenhouse. This helps control the fermentation rate and maintain optimal conditions.
6. The fermentation process should start at a minimum temperature of 15°C. Ensure the environment is warm enough to activate the microorganisms.
7. This product is suitable for all types of greenhouses, including those used for growing fruits, vegetables, seedlings, and flowers during the off-season.
8. Store the product in a cool, dry place away from direct sunlight to maintain its effectiveness.
By following these steps, you can efficiently use the greenhouse warming starter to regulate temperature and improve crop growth in your greenhouse. It’s an eco-friendly and cost-effective solution that supports sustainable agriculture practices.
Engineering Vehicle Parts
This classification mainly includes the aluminum die casting Machinery Parts using in Engineering Vehicle area.
From the part, we can easily find that the parts have a lot of features of big cavities, so the part will have big potential risk of mold release problem, if so, the part may happen to be deform, sticking to the mold etc, especially when the part sticking to the mold, if no clear in time, while next shot, the mold may be destroyed while clamping.
Normal raw material: ADC12,A380,YL102
Process Technology: Low-pressure casting,Shot Blasting,NC Machining,Spray Coating
Product Dimensions: Customized
Casting General Tolerance: Grade GBT6414-CT8
Flow Processes: Die casting, Degating to remove the residual of the gate, Polishing and Deburring to remove the burrs, Polishing to remove the parting line, flash,CNC Turning, Cleaning, Packaging, Storaging, Shipping
Control Measure: Incoming Material Test, First Article inspection, Routing inspection, Final item inspection, and Outgoing quality control
Inspection Equipment: CMM, Caliper, Plug Gage, Screw Gauge
Application: Machinery Parts
Certificate: IATF16949:2016,ISO14001:2015,ISO45001:2018
Lead Time: 30-35 days
Trade Term: FOB Ningbo
Die Casting Engineering Vehicle Parts,Die Casting Engineering Vehicle Part,Al Die Casting Engineering Vehicle Parts
NINGBO ZHENHAI BOLANG METAL PRODUCTS FACTORY , https://www.casting-part.com