Canopy warming starter use which note 8 points

The greenhouse warming starter is designed to help manage temperature rise in greenhouses, and here are 8 key points to consider when using it effectively: 1. For a typical greenhouse measuring 60m x 7m, you will need approximately 4kg of the warming starter. This includes 3kg of the starter mixed with 30kg of wheat bran or rice bran. 2. The required amount of the starter should be evenly mixed with 10kg of rice bran or wheat bran. Additionally, about 8kg of water should be added to the mixture. Ensure that the moisture level is just right—when squeezed in your hand, it should hold together without dripping. If water drips, add more bran; if no moisture appears, spray more water until the right consistency is achieved. Once properly mixed, the material should be stacked and left undisturbed for 12 to 24 hours at a temperature between 20°C and 25°C. 3. To enhance bacterial activity, you can spray the straw with a 2% urea solution or brown sugar water. Alternatively, soak the straw in water for 12 to 24 hours before placing it in the greenhouse to form a pile. 4. Layer the straw, manure, and fermentation starter alternately, ensuring even distribution for optimal heat generation. 5. Adjust the thickness of the straw layer depending on the type of crop and the desired greenhouse temperature. This helps regulate the fermentation process and maintain the ideal heat level. 6. The fermentation process should begin at a temperature of 15°C or higher. Lower temperatures may slow down or prevent the process from starting. 7. This product is suitable for all types of greenhouses, including those used for growing fruits, vegetables, seedlings, and flowers during the off-season. 8. Store the product in a cool, dry place away from direct sunlight to maintain its effectiveness. By following these steps carefully, you can ensure efficient and consistent temperature control in your greenhouse, supporting healthy plant growth throughout the season.

Milling Machines Head Assembly Parts Housing

This classification mainly includes the aluminum or zinc alloy die casting parts using in Milling Machines area.In the die casting process,higher specific pressure is required, so that higher filling speed can be obtained.which is beneficial for alloy to overcome mold filling resistance.and effectively fill each part of the cavity.The Casting General Tolerance is Grade GB-CT4.
Process Technology: High pressure die casting, Cold Chamber
Product Dimensions: Customized
Casting General Tolerance: Grade GB-CT4
Flow Processes: Die casting, Degating to remove the residual of the gate, Polishing and Deburring to remove the burrs, Polishing to remove the parting line, flash,CNC Turning, Cleaning, Packaging, Storaging, Shipping
Control Measure: Incoming Material Test, First Article inspection, Routing inspection, Final item inspection, and Outgoing quality control
Inspection Equipment: CMM, Caliper, Plug Gage, Screw Gauge
Application: Machinery Parts
Certificate: IATF16949:2016,ISO14001:2015,ISO45001:2018
Lead Time: 30-35 days
Trade Term: FOB Ningbo

Milling Machines Die Casting Assembly Parts,Milling Machines Die Casting Parts Housing,Milling Machines Die Casting Housing

NINGBO ZHENHAI BOLANG METAL PRODUCTS FACTORY , https://www.casting-part.com